Dove Road Intersection and Drainage Improvements

|
Project Information: Intersection improvements at the N. Carroll Avenue and N. White Chapel Blvd. at Dove Rd. are similar to the existing roundabout at S. Carroll Avenue at E. Continental Blvd. This project included utility relocations and drainage improvements as well as paving of the intersections. Additionally, sidewalks from Dove Tower to the new CISD school along N. White Chapel Blvd were constructed in October 2010. Improvements consist of a box culvert storm sewer under both roundabouts. Associated inlets and attachments have been constructed with the box culvert. Both roundabouts incorporate design concepts from the Urban Design Study including brick pavers, landscaping, and public art. Click here for a conceptualized drawing. To learn more about the Urban Design Study, please visit the Planning and Development Services Department here.
Project Details: Engineering Consultant: Lee Engineering Construction Contractor: Quality Excavation, Ltd. Construction Costs: $ 3,237,846.23 Staff Contact: Cheryl Taylor, P.E., Civil Engineer, (817) 748-8098.
Percent Complete:
Learn More about each of the Intersection Improvements and View Construction Photos here:
Learn more:
|