FY 2009 Capital Improvements Program
The capital projects links listed below are broken down by department and provide details about each capital project including costs, funding source and timeline for completion. Questions about the projects should be directed to the department director. To learn more about the departments themselves, please click on the links to the right.
Community Services- Director Chris Tribble - 817-748-8021
- Recreation Center, Senior Center and Library (page under construction)
- Lonesome Dove Park Improvement
- Trail Improvements (Dove Trail Development)
- Bicentennial Park Improvement Phase I
- 'North Park' Design and Development
- Royal and Annie Smith Park Development
- Liberty Park at Sheltonwood Park Development
Department of Public Safety- Assistant City Manager/DPS Director Jim Blagg - 817-748-8400
- DPS Headquarters
- North DPS Facility (page under construction)
Public Works - Director Robert H. Price, P.E. 817-748-8098
- Public Works Quarterly Report (Last updated March 4, 2010):For a quick summary of all Public Works construction projects either under design or under construction, please read the latest Public Work's quarterly report.
- Detailed Capital Projects: For more detailed information regarding a particular construction project and to find out what to expect in the near future, please visit the individual project links below:
- DFW Connector - TxDOT Project
- Dove Road Intersection and Drainage Improvements
- Southlake Blvd Improvements
- FM1709 Utility Relocations
- FM1938 - TxDOT Project
- Highland Street 12-inch Water Line and Reconstruction
- Intersection Improvements at S. White Chapel Blvd. at Continental Blvd.
- Neighborhood Sewer Program
- Street Widening - N Kimball Ave from SH 114 to Dove Rd
- T. W. King 30 inch Water Supply Line to Pump Station #2
- FY 2009 Sidewalk Construction: For more detailed information regarding a particular sidewalk project, please see the December 2008 Sidewalk Priority List Presentation or follow the links for the individual projects below:
- Carroll Avenue
- Segment #3:East side of North Carroll Avenue from Dove Road to Taylor Street
- Segment #8:East side of North Carroll Avenue from Bay Meadows Drive to Whispering Lane
- Southlake Boulevard/F.M. 1709
- Segment #2:North side of F.M. 1709 from North White Chapel Boulevard to future deceleration lane in front of Bicentennial Park
- Segment #4:North side of F.M. 1709 from the Mendez Development to future deceleration lane at Foxborough Lane
- Segment #5:North side of F.M. 1709 from Foxborough Lane to future deceleration lane at Diamond Boulevard
- Segment #6:South side of F.M. 1709 from Harris Methodist to future deceleration lane at Miron Drive
- Segment #7:South side of F.M. 1709 from Davis Boulevard to Players Circle
- Segment #9:North side of F.M. 1709 from Diamond Boulevard to White Chapel Boulevard
- Segment #11:South side of F.M. 1709 from Chick-fil-A to existing sidewalk at Georgetown Park and continuing to Nolen Drive
- Deceleration lane sidewalks(Sidewalks are included as part of the larger deceleration lane project)
- Segment #10:Connecting Gallant Court and Johnson Place Estates
- For more information on sidewalks, please visit the Planning and Development Services Department here.
- Archived Projects:
- Sidewalk Segment: East side of South Carroll Avenue from Westmont Drive to Bordeaux (Completed August 2009)
- S. Carroll Ave. Lane Reconfiguration Adjacent to Central Market(Completed July 2009)
- 20 inch Water Line at FM 1709 and Carroll Avenue (Completed June 2008)
- Dove Rd. Reconstruction - White Chapel Blvd.to Carroll Avenue (Completed March 2008)
- Carroll Avenue